8. OPERATION
8.1 START UP PROCEDURES
With the Voltage Stabiliser Powered down and the load switched “OFF” –
Switch the Input Circuit Breaker to the “ON” position.
After switching “ON” the Automatic Voltage Stabiliser, the output voltage from the
stabiliser will rise to the pre-determined set value. The Stabiliser should then
automatically continue to maintain the voltage at this level – in accordance with the
selected unit’s specification.
Turn on the load equipment. (If the stabiliser is fitted with an optional Output Circuit
Breaker), switched the Output Circuit Breaker to the “ON” position.
8.2 SHUTDOWN PROCEDURE
With the load equipment powered down --
Switch the Input Circuit Breaker to the “OFF” position.
8.3 BYPASS CONTROL SWITCH
The Voltage Stabiliser is fitted as standard with a Bypass Control Switch. This switch
allows the bypassing of the electronic control circuits. This is to enable main supply to
be fed to the load (without regulation).
WARNING!
The switching / operation of this switch (and that of any
optional Manual Maintenance Bypass Switch) should not be
performed while the stabiliser is still supporting load.
Switching whilst on load could easily damage the
stabiliser and potentially the load equipment.
Please do not ignore the warning label by the Control Switch!!!